OEM Excavator Track Link Assembly – 40% Longer Life vs Standard

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000
​​Excavator Track Links – Heavy-Duty Chains Built for Non-Stop Work​

​​Excavator Track Links – Heavy-Duty Chains Built for Non-Stop Work​

Let's face it, your excavator's tracks take a serious beating every day. On a job site, building debris, rocks, and mud add up and wear out your chains in no time. That's exactly why we built these track links to endure whatever the job site has to throw at it day after day. These are a massive step up from a standard link. We use superior grade​ ​alloy steel and heat treat it to the highest possible toughness and durability. They are also significantly tougher (30% - 40%) than a standard link. If you can wear fewer links out, you will have less down time and more money in your pocket.
Get A Quote

The Advantages of Excavator Track Link Assembly

"Tougher Than a Mine Shaft" Construction​

We start with military-grade alloy steel—the kind used in armored vehicles—then heat-treat it until it laughs at rocks and mud. These aren’t just stronger, they’re smarter. Reinforced pin holes won’t oval out, and the hardened surfaces shrug off abrasives that destroy standard links.

High-strength, ultra-long-lasting build for environmental conditions

We employ just the best alloy steel for our track link assembly and then heat-treat it to provide maximum resistance to wear, impacts, and deformation. Designed particularly to work under extreme operating environments of mining, construction, and demolition, our track links retain structural integrity under the presence of heavy continuous load as well as under abrasive working conditions.

Engineering Precision for Smooth Operation

All of our components are built to close tolerances in order to provide exact fit and function with rollers and sprockets. Our low-friction bushing design and precision machined surfaces reduce up to 30% of friction, which improves track travel, fuel efficiency, and stress on your excavator's overall undercarriage system.

Low-Cost Design for Lower Maintenance

With a 40% increase in service life over OEM components, our track link assembly costs replacement and downtime approximating half that of an OEM component. The new modular design can have the components replaced as necessary, potentially saving you about 60% of the repair cost compared to whole system replacement.

OEM DH220/SK350/R200 Excavator Track Link Guard

Heavy-Duty Excavator Track Link Assembly – Designed for Mining, Quarrying & High-Earthmoving

Military-Grade Construction for Severe Applications
Our track link assembly is designed to take the abuse of mining, quarry, and heavy earthmoving. Built from specially hardened alloy steel with bolstered pin and bushing systems, our track links offer 50% greater wear resistance than OEM parts to provide durable performance in abrasive, high-impact applications.
Maximum Protection with Advanced Sealing Technology
With an innovative triple-seal configuration using high-viscosity grease grooves, our track link assembly is designed specifically to exclude mud, dirt, and water. Our unique sealing system maintains essential lubrication 4 times longer than theirs and excludes 99% of contaminants - greatly improving wet or sandy life.
Precision Engineered for Optimal Performance
Each bushing is constructed to exact tolerances with the precision of laser technology, producing perfect alignment and consistent roller and sprocket contact. Lowered friction by up to 35% reduces track movement, fuel consumption, and stress on your entire undercarriage system in your excavator.
Economical Solution for Heavy Machinery Fleets
60% longer service life over standard track links means that our assembly cuts replacement and downtime to a fraction of the regular amount. Individual items may be replaced as required under the modular style, saving up to 70% on the cost of repairs compared to replacement of the complete assembly - a key consideration for fleets of large equipment.

FAQ

What performance advantage does your track link assembly provide?

It is established that excavator link assemblies maximize performance through its precision-forged alloy steel links and induction-hardened bushings that reduce track slippage by 35% without any loss of power-transferring efficiency. Its construction ensures that the track may be kept at maximum tension for increasingly extended periods of time, which means less undercarriage wear and more machine stability, particularly when operating on slopes. This enhanced construction should provide smoother operation and improved fuel efficiency than OEM parts.
Our triple-seal construction with labyrinth grease paths is a significant improvement over traditional designs, giving three different advantages: 98% exclusion of abrasive contaminants, five times longer lubrication life, and up to 60% less bushing wear. This state-of-the-art sealing system has been thoroughly tested and proved effective in the toughest mining and demolition applications where traditional seals would typically wear out too rapidly.
Our track link assembly is application-specific, but is always much more durable than an OEM or replacement part. In general earthmoving applications, we expect you will get between 8,000-10,000 hours of life; in abrasive quarry applications, expect between 5,000-7,000 hours; and in tough mining applications, you can expect anywhere between 3,000-5,000 hours. OEM replacement parts will generally provide 30-50% lesser operational hours, and on a full product life basis, will provide considerably less value than our assemblies.
Our new modular design is highly cost-saving by allowing the targeted replacement of particular worn components - including bushings, individual links, and seals - rather than requiring assembly replacement as a whole. By this approach, maintenance expenses can be reduced by as much as 70% without loss of assembly performance characteristics. The design also simplifies maintenance operations and minimizes equipment downtime for repair.

Our Company

Bauma Munich 2025 Highlights – Grateful for Your Visit!

22

Jul

Bauma Munich 2025 Highlights – Grateful for Your Visit!

bauma is more than the world’s leading trade fair for construction, building material and mining machines, construction vehicles and construction equipment: it is the heartbeat of the industry and international success engine, innovation driver and marketplace.
View More
CTT Expo 2025 – Thank You for Visiting Booth 8-841!

22

Jul

CTT Expo 2025 – Thank You for Visiting Booth 8-841!

International Trade Fair for Construction Equipment and Technologies
View More
Valuable Insights and Deeper Connections at bauma CHINA 2024

22

Jul

Valuable Insights and Deeper Connections at bauma CHINA 2024

View More
Common Causes of Undercarriage Wear in Excavators and Dozers—and How to Prevent Them

11

Jul

Common Causes of Undercarriage Wear in Excavators and Dozers—and How to Prevent Them

View More

What Our Clients Are Saying

Michael T.
Michael T.
Mining Operation Savior!

Our 60-ton excavator was burning up standard track links every 4 months at the copper mine. These premium assemblies have lasted 14 months and still going strong! The triple-seal technology truly keeps abrasive ore dust out of the bushings. We've saved 40% on undercarriage maintenance since the switch.

 Jennifer K.
Jennifer K.
Quarry-Proven Performance

After experimenting with a couple of other brands, these track link assemblies have performed the best in our granite quarry. The induction-hardened bushings wear remarkably little after 10,000 hours - 3 times more than our previous links. The fit was so accurate, it eliminated our track derailment issue completely. Every cent was worth it!

David R.
David R.
Heavy Construction Champion

These track links ride out the rough conditions of our dam building project without a problem. The alloy steel build resists regular rock impacts that would bend regular links. Only rated 4 stars because installation took a bit more force than OEM, but the amazing durability makes up for it many times over.

Sarah L.
Sarah L.
Fleet-Wide Reliability

We've standardized our entire 22-excavator fleet on these track link assemblies. The modular design allows us to simply replace only the worn components, not thousands in parts dollars. Our records show 35% more average life over premium OEM parts. Customer service helped us select the perfect models for each machine application.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000
Why Choose Us

Why Choose Us

Our heavy-duty excavator track link assembly is built for hard mining, quarry, and earthmover service. It is forged out of mil-spec alloy steel with induction-hardened pins and bushings 60% more wear-resistant than the OEM model and with a triple-seal design featuring labyrinth grease paths to keep out contamination while allowing for lubrication five times the base-model. This greatly extends service life in wet, sandy, or abrasive conditions.
WhatsApp WhatsApp E-mail E-mail YouTube YouTube FaceBook FaceBook Linkedin Linkedin
email goToTop