Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000
300t twin ram hydraulic machine hydraulic track link press machine-0

Hydraulic Track Press

Home >  Products >  Hydraulic Parts >  Hydraulic Track Press

250T/300T Twin Ram Hydraulic machine Hydraulic Track Link Press Machine

250tons hydraulic track pin press. Fix different pitches(<228mm) of track links like PC60-PC400, D2-D8 etc
300tons hydraulic track pin press.Fix different pitches(<260mm) of track links like PC60-PC800, D2-D11etc.

Product Description

300T Twin Ram Hydraulic machine Operation

250tons hydraulic track pin press. Fix different pitches(<228mm) of track links like PC60-PC400, D2-D8 etc
300tons hydraulic track pin press.Fix different pitches(<260mm) of track links like PC60-PC800, D2-D11etc.

250T/300T Twin Ram Hydraulic machine Hydraulic Track Link Press Machine factory

250T/300T Twin Ram Hydraulic machine Hydraulic Track Link Press Machine manufacture

Track press description

1 Hydraulic press 300T
2 RAM SPEED FORWARDS AND REVERSE 190X2mm
3 Worktable Height Adjustment 825mm
4 Motor power 5.5KW
5 PUMP FLOW RATE 40ML
6 PUMP PRESSURE 36MPa
7 Press link machine dimension 1880X580X1350MM
8 HYDRAULIC OIL TANK CAPACITY 150L
9 Voltage 380V 50Hz three-phase
10 Pitches ≤317mm
11 Model Fit for PC60-PC400,D20-D355,D9N,D10

ASSEMBLING OPERATION

250T/300T Twin Ram Hydraulic machine Hydraulic Track Link Press Machine supplier 250T/300T Twin Ram Hydraulic machine Hydraulic Track Link Press Machine factory 250T/300T Twin Ram Hydraulic machine Hydraulic Track Link Press Machine details
①Elements of the chain section in assembling position.                 ②Link asseing phase.                                                ③Section of assembled chain.

DISASSEMBLING OPERATION

250T/300T Twin Ram Hydraulic machine Hydraulic Track Link Press Machine manufacture 250T/300T Twin Ram Hydraulic machine Hydraulic Track Link Press Machine details 250T/300T Twin Ram Hydraulic machine Hydraulic Track Link Press Machine factory

①Section of chain in disassembling position.              ②Pushers against pin and bush.                      ③End phase of the link disassembling.

Track Press machine Assembly and disassembly Operation Pay attention :
1.We must fill antifriction oil into the oil tank before start the operation
2.Please inspect the motor is under the corotation condition (please check the motor corotation mark)
3.Up and down board has been already tuned, please don’t adjust casually
4.When assembling the track link section, please adjust the mold according to the link pitch
5.When disassembling the tracking link, please fit the disassembly head in one side of the cylinder,and use the guard to ward off the track link in other side of the cylinder .

Track press part

250T/300T Twin Ram Hydraulic machine Hydraulic Track Link Press Machine supplier

Track-press-mold

Assembling mold and disassembling mold Pitch form154,171 ,175,190, 203,216,228,260,280

250T/300T Twin Ram Hydraulic machine Hydraulic Track Link Press Machine details

Track press machine Packing and Shipping

250T/300T Twin Ram Hydraulic machine Hydraulic Track Link Press Machine details

Daily Maintenance
1. After each day's work, clean the chain press machine from oil, dust, and debris to keep the machine clean. Wipe the machine body, workbench, control panel, and other parts with a clean cloth.
2. Check all bolts and nuts at all connections for looseness. Tighten any looseness immediately. Focus on the connections between the main unit and workbench, the cylinder and oil pipe, and the mold and workbench.
3. Inspect the hydraulic system hoses for damage, aging, or leakage. Replace any problems immediately. Also, check the hose joints for tightness. Tighten any looseness immediately.
4. Check the oil level in the tank for the correct level. If the level is too low, refill the hydraulic oil immediately. The oil level should be checked after the machine is shut down and the oil has cooled to ensure accurate measurements.
5. Check the motor and oil pump for normal operating sounds and any abnormal vibration or heat. If any abnormalities are detected, immediately shut down the machine for inspection and troubleshooting.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000
inquiry

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000
WhatsApp WhatsApp E-mail E-mail YouTube YouTube FaceBook FaceBook Linkedin Linkedin
email goToTop